Code RAG RAG Date Manager Status Stage
AV2601 KB-New_Darwin_Project (NDP) John Power Withdrawn Initiate
AV2687 Edinburgh Futures Institute (EFI) GREEN November 2024 Stephen Dishon Closed Close
AV2793 KB-Engineering Module 1 Project (EM1P) John Power Not Started Design
AV2983 Edinburgh College of Art Project (ECAP) - Stage 2 John Power Not Started Design
AV2984 Teviot Row House Project (TRHP) - Stage 2 John Power Withdrawn Analyse
AV2994 LF-Chancellors_Building_LF1_Project (CBLF1P) John Power Withdrawn Design
AV3000 Agriculture & Food Academy Project (AFAP) John Power Closed Close
AV3018 TAP23 - ECA Rooms GREEN September 2023 Stephen Dishon Suspended Integrate
AV3033 Mary Bruck Building Project (MBBP) GREEN November 2024 John Power Closed Close
AV3039 JCMB LT Teaching Wall Replacement Richard Leslie Withdrawn Close
AV3040 Appleton Tower AV Reinstatement AMBER July 2024 Richard Leslie Withdrawn Procure
AV3041 TAP - Sanderson LT1 Richard Leslie Withdrawn Initiate
AV3048 Old College - Semple Room & Social Space Richard Leslie Withdrawn Initiate
AV3049 Appleton Tower - Level 8 Reconfirmation Richard Leslie Withdrawn Initiate
AV3069 Adam House LT Stephen Dishon Withdrawn Initiate
AV3074 Murchison House Teaching Studio GREEN December 2024 Richard Leslie In Progress Build
AV3081 Fleeming Jenkin Builing Lab 1.65 Refurbishment Project GREEN November 2024 John Power Closed Close
AV3082 Medical Quad Doorway 1 Refurb Stephen Carter Suspended Analyse
AV3083 First Opinion Practice Project (FOPP) John Power Not Started Initiate
AV3084 CRIC4 Imaging Project (CRIC4IP) John Power Not Started Initiate
AV3085 RAAC 24-25 Semester 2 GREEN December 2024 Richard Leslie In Progress Build
AV3097 Swann Level 7 Teaching Lab Project (SL7TLP) John Power Not Started Initiate
AV3099 KB House Teaching Studio Richard Leslie In Progress Analyse