Non Functional Testing
Reference | Scenario / Acceptance Criteria | Tested By | Date Tested | Outcome Pass/Fail | Notes |
1 | Incremental Load Testing |
|
|
|
|
1.1 | Load a complete calendar for the following numbers of students and record the end to end time for the process. 5,100,200,500. |
|
|
|
|
2 | Activity Change and Logging Testing |
|
|
|
|
2.1 | Make a change in Timetabling that will result in an activity being added to the calendar. Extract the logs from the database. | ||||
2.2 | Make a change in Timetabling that will result in an activity being updated in the calendar. Extract the logs from the database. | ||||
2.3 | Make a change in Timetabling that will result in an activity being deleted from the calendar. Extract the logs from the database. | ||||
3 | Student Specific Tests | ||||
3.1 | For one student change their course. Extract the logs from the database. | ||||
3.2 | Test the process to re-build the calendar for a single student. Extract the logs from the database. | ||||
3.3 | Change a students email address to an invalid address and re-build the calendar for that student. Extract the logs from the database. |
Link to Detailed Test Plans