Analyse

This page is to assist in the identification of application that are in scope of this project.

No

System

Contact

Notes

Response

7

COLLABORATIVE PLANNING

Anne Graham

CMVM High Performance Compute (HPC) Survey Analysis

Introduction

As part of the HPC strategy, we carried out a survey of staff from late September through to November ‘18 to better understand how the service usage varied across the college.  We had a very mixed level of response from different areas of the college, as shown below:

This page links to the restricted access Room List, which is being used as the basis for the rooms trialling hybrid meetings in CMVM.

As part of the works to complete the eTime 16/17 project a task was undertaken to complete analysis and an estimation on the Business requirements to deliver an automatic electronic signature - eSignature - process. 

Attached is a document that contains the analysis works completed an an estimation (as of May 2017).

 

 

This page describes the applications considered to be in scope for USG008 at the end of planning stage.

This is the current inventory managed by this project.

A paper has been produced that summarises the analysis and engagement work carried out to gather requirements, the feedback received and a summary of the high level requirements that the project will deliver in a phased manner. This has been reviewed and signed off by the Project Board.

Please see the paper here.

 

Rollback Plan

1. Restore from apps folder backup:     /u01/software/apphr/apps

2. Restore from oracle db backup to the same time as above

3. Functional test by Apps Man, HR, and Payroll