Analyse

(20/07) Draft Document added

(12/08) Document updated. 

(24/08) Document updated.

(13/07) Draft added

(10/08) Draft updated

 

tools techniques and guides to be developed

Acceptance Test Strategy

The following will be confirmed in the 'User Acceptance Test Plan' document:

  • Scheduling and duration
  • Test setup requirements (e.g. test environment, co-dependencies, business cycles) 
  • Sources of test data
  • Test scripts
  • Required test participants and any training requirements
  • Technical and business support required during testing
  • Communication requirements

 

 

Test Scenarios and Acceptance Criteria

 

The following is to be considered:

  • Which groups will require training - ISHR
  • Who will provide training – ISHR/Service Management
  • Required Format of training materials - TBC

Descriptions

ISHR have a filing cabinet with around 715 staff files in paper format (as at 31 July 2016). Each staff file is in a folder that is divided into the following ten sections, with relevant documents stored in each section:

  1. Contracts & Terminations
  2. Migrant Worker
  3. Sickness Absence
  4. Leave
  5. Learning and Development
  6. Oracle
  7. Grievance/Disciplinary
  8. Induction and Probation
  9. Recruitment Paperwork
  10. Miscellaneous

An estimate of the volume of paper files is as follows:

Functional Requirements

ID

Requirement

Category

1.1.A

Option A: Create a digital file for each document (715 x 60 = 42,900 files)

COULD HAVE

1.1.B

Option B: Create a digital file for each section (715 x 10 = 7,150 files)

SHOULD HAVE

1.1.C